About Us
Our Approach
Our Solutions
The Track Record
Specifying
 
Choosing the right solution

This section allows you to tell us about your project and the particular stormwater management requirements.

It will save you time with the design and specification of your filtration system to ensure that it meets the water quality objectives (WQOs) specific to your project. It will also provide us with all the important information to enable us to help you.

Once you have completed the form please click on the SEND button. Your comments will be automatically forwarded to your nearest Ecosol office for immediate attention.

Alternatively, you can download and print the PDF form, answer the questions as best you can (in My project details) and fax it to your nearest office (on the form) for a prompt response.

Download form (51Kb, PDF)

If you are unsure of any matter, please contact us.

Once we receive your completed form we will respond within two (2) working days with a request for more information (if that is needed), an assessment of your requirements, and a proposed solution(s).

Note, if you subscribe to the MUSIC stormwater management planning system, we can provide input values and advice for the  RSF 100, RSF 1000 and RSF 4000 products.  Please go to the bottom of each of the product pages.

If you would like to know more about MUSIC, click here for an easy-to-read overview or go to www.toolkit.net.au.

 

Wastewater solution definition

My Contact Details  
Company name:
Contact name:
Project name:
Project address:
Email:
Phone:
Fax:

Factor My Project Details
Structure number (Reference point):
Catchment type: commercial industrial residential
Catchment area: ha
Designed discharge (maximum flow):
E.g. ARI 1 in 50 L/s
L/s
Proposed Treatable Flow Rate
E.g. (1-in-3 month ARI)
L/s
Outlet pipe diameter: mm
Inlet Pipe diameter: mm
Pipe gradient at inlet: %
Pipe gradient at outlet: %
Depth to pipe invert: mm
Is the unit to be situated in a trafficable area? Yes    No
Will the unit be placed on a permanent or transient water table? Yes    No
Will the unit be installed in aggressive soils such as acid sulphate soils or salt enriched soils? Yes    No
Will the outlet pipe be submerged or in part subject to the effects of incoming tides? Yes    No
Required storage capacity: Litres (L)
Pollutants to be removed
E.g. litter, oil, sediment etc.
Type of cleaning preferred and frequency:
Is the site accessible by vehicle? Yes    No
Aesthetics  
Are there visual aspects that need to be taken into account in the design, such as decorative access covers at finished surface level?
Hydraulic Conditions  
Is the drainage system subject to surcharging or tidal influences? Yes    No
Are the pipes partially or fully submerged? Yes    No
Other factors or comments  
Describe any other requirements that should be taken into account in the system design, such as other devices used on same line, timing, budget etc.

Select the location closest to you, then click "send".